1. When Should You Commission an Independent Feasibility Study First?
For a 3 kWp – 10 kWp home rooftop, a physical ROOFITPV site survey and standard shadow layout provide everything needed to move forward cleanly. However, for 50 kWp – 2 MW+ Commercial, Industrial (MIDC), or Bank-Financed Solar Projects, decision-makers and lenders often require neutral, third-party engineering & financial validation before releasing CAPEX.
2. Core Metrics Evaluated in a Bankable Solar DPR
- Specific Yield (kWh/kWp/year): Location-specific generation modeled from satellite irradiance (Metenorm/Solargis) and 3D near-shading in PVsyst.
- Performance Ratio (PR %): Ratio of actual AC energy delivered to theoretical irradiance energy, accounting for thermal, DC/AC cabling, inverter, and soiling losses.
- 25-Year Financial Model: Net Present Value (NPV), Internal Rate of Return (IRR), Debt Service Coverage Ratio (DSCR), tariff escalation sensitivity, and O&M reserve planning.
3. Seamless Ecosystem Handoff to WATTPVFY
Within our 3-division energy ecosystem, independent engineering advisory is kept structurally separate from EPC execution. You can commission a neutral feasibility study, 12-month bill diagnostic, or bank-ready Solar DPR directly via WATTPVFY Knowledge Centre & Advisory ↗—and then seamlessly hand off the approved specification to ROOFITPV for turnkey EPC execution.