Bill & Roof Screening
Share 3–12 months of electricity bills and your location pin. We evaluate sanctioned load, tariff category, daytime load profile, and preliminary roof area.
Structured project management with documented safety checks at every milestone—so there are no surprises during installation or DISCOM commissioning.
Share 3–12 months of electricity bills and your location pin. We evaluate sanctioned load, tariff category, daytime load profile, and preliminary roof area.
Our engineer visits your premises to measure exact usable area, map nearby shading obstacles, inspect RCC waterproofing or tin-shed purlins, and check the main DB/LT panel.
We prepare a shadow-free array layout, electrical Single Line Diagram (SLD), ALMM module & inverter Bill of Materials (BoM), and milestone-linked commercial offer.
Upon order confirmation, we initiate net-metering feasibility registration on the MSEDCL / Tata Power / Adani portal and coordinate CEIG drawings via AAROHAN ELECTRICALS if required.
Fabrication and installation of galvanized steel or anodized aluminum mounting structures using waterproof chemical anchors or leak-proof tin-shed clamps with calibrated torque checks.
Clean UV-resistant DC string cabling, DCDB/ACDB with Type-II SPDs, inverter mounting, three dedicated IS 3043 earthing pits (DC, AC, LA), and lightning arrestor installation.
Full IEC 62446 pre-commissioning checklist (Voc, polarity, IR/Megger, earth resistance, anti-islanding), bi-directional net-meter installation, and utility grid synchronization.
Handover of as-built drawings, module serial sheet, warranty certificates, cloud monitoring app setup, and optional annual preventive Solar O&M / AMC program.